Work Method Statements
3R Laser on Construction Site Work Method Statement
The 3R Laser on Construction Site Safe Work Method Statement (SWMS) is a comprehensive 9 page procedure. This SWMS covers use of Class 3R Lasers at construction sites (for alignment, leveling, control and survey tasks etc).
The 3R Laser on Construction Site procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The 3R Laser on Construction Site Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Set up
- Operation
- References
Product Details:
- 9 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Planning:
- Liaise with principal contractor. Ensure following is provided before work commences:
- Site specific induction (include location of amenities, first aid facilities, emergency plans and evacuation points, incident reporting, communication, contact persons etc)
- Health and safety rules for site
- Supervisory arrangements
- PPE requirements for site (hard hat, high visibility clothing, safety boots, etc)
- Types of hazards at site
- Site plans – showing no go zones for pedestrians
- Traffic management plans
- Relevant SWMS and JSA’s
- Site security requirements
- Information to workers on site re: hazards of lasers
Ensure all persons have a Construction Induction Card (or equivalent).
Ensure laser is appropriate for task.
Note: Class 3B and above are not permitted for use on construction sites.
Ensure site will have sufficient lighting.
Note: Class 3R lasers must not be used in dimly lit areas. (Dimly lit = causes pupil to dilate more than 5mm in diameter and less than 100 lux).
Develop a site and task specific SWMS.
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.