Work Method Statements
Aluminium Handrail Installation Work Method Statement
The Aluminium Handrail Installation Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure outlining the safety steps for Installing Aluminium Handrails.
This SWMS covers installation of pre-fabricated, aluminium handrails for permanent structures. This does not include installation of temporary perimeter protection for the prevention of falls at construction sites.
The Aluminium Handrail Installation procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Aluminium Handrail Installation Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Transport
- Installation
- Completion
- Emergency Procedures
- References
Product Details:
- 10 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Planning
Assess intended work site. Ensure:
- adequate lighting
- sufficient room for employee and materials
- suitable work platform
- suitable weather conditions
- traffic management controls are in place where required (barriers, exclusion zones etc)
- location is not in close proximity to other hazardous works (hot works, excavating, work overhead etc)
- Fall risks are mitigated (barriers, fall prevention etc)
- Emergency/Rescue Plan in place
- Area is restricted to prevent unauthorised access
- Kickboards/catch nets are installed as required
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.