Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Bark Blower - Safe Work Procedure or Work Method Statement

Bark Blower operation can be performed safely when correct procedures are used. The Barkblower Procedure is a seven page safety procedure that includes:

  • Site Risk Assessment
  • Pre-Start Checks
  • Operators Requirements
  • Planning
  • Vehicle Operation
  • Loading Bark Into Vehicle
  • Working On Embankments
  • Operating Barkblower
  • 7 Page Complete Procedure
  • MS Word Format
  • Ready to Use
  • Version 4.0
  • Suitable For Sub-Contractors & Employees

 

SWP_Sample

Back       Buy Now $79.95 plus GST

Bark Blower Safety Notes

Vehicle Operations:
Ensure the vehicle is maintaned and checked daily to ensure safety. Maintain the cleanliness of the vehicle. Report any urgent maintenance issues straight away.

Loading Operations:
Confirm there are no overhead powerlines.
Avoid loading on slopes, and ensure there is no one under or around the tray.
Never use the vehicle if the load is uncovered.

Servicing:
Ensure all equipment is thoroughly checked and in a safe manner.

Forklift_Safety















To Purchase The Complete Safe Work Procedure Bark Blower Use Choose The By Now Option Below.

Back       Buy Now $79.95 plus GST