Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Boiler Maintenance – in service Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Boiler Maintenance – in service, Safe Work Method Statement (SWMS) is a comprehensive 13 page procedure. This SWMS deals with general safety issues associated with cleaning, inspection, maintenance and servicing of boilers. This SWMS does NOT provide detailed information on HOW to undertake these tasks, as detailed qualifications are required for those activities. Task-specific SWMS should be developed for hazards, such as Confined Spaces, Hot Works, Work at heights (above 2m), Working with Friable Asbestos, Asbestos Removal, Lock Out/Tag Out procedures etc, as necessary.

The Boiler Maintenance – in service procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Boiler Maintenance – in service Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:

  • 13 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery
Related Products:

Preparation:

Assess site. Check:

  • Load bearing capacity of support walls, ceiling, roof (if required to enter roof areas)
  • Height of work area
  • Access for equipment (including height access equipment) and materials
  • Power supply
  • Lighting
  • Hazardous works in close proximity
  • Potential for atmospheric contaminants

Ensure suitable equipment for job:

  • Carbon Monoxide monitor (and other air monitoring equipment) functional and calibrated
  • Flashlight, batteries charged
  • PPE as required (hard hat, safety glasses, hearing protection, heat-resistant gloves, breathing protection if required)
  • Thermal imager (if applicable)

Check area around boiler:

  • Clear of dust, debris or stored items
  • No flammable or combustible materials
  • Sufficient clearance to avoid hot surfaces
  • Condition of asbestos pipe lagging (if present) is acceptable (no cracking, peeling, chipping or obvious damage.) If unacceptable, do not begin work. Seek services of licensed asbestos removalist to remove/ make area safe.
  • Fire protection equipment sufficient, in test date.

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.