Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Chain Trencher Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Chain Trencher Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for using a Chain Trencher.

This SWMS concerns backhoe-mounted trenching attachments/trencher booms.

The Chain Trencher procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overall OHS System.

The Chain Trencher procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Preparation
  • Pre-inspection
  • Operation
  • Maintenance
  • Emergency Procedures

Product Details:

  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • Instant download delivery

Chain Trencher illness can include:

  • fainting
  • heat stroke
  • fatigue/exhaustion
  • rashes (such as prickly heat) or heat cramps
  • worsening of pre-existing medical conditions

Preperation:

Assemble trenching attachment onto backhoe as per manufacturer’s instructions.

Check that trencher is attached correctly:

  • Ensure hitching points are secured/tightened
  • Ensure locking pins are in place and engaged

Prepare intended work site:

  • clear debris, waste, tools or other potential tripping/entanglement hazards
  • establish an exclusion zone (no less than 10m from dig area)
  • clear surface obstructions (grass clumps, rocks, shrubs/weeds etc)
  • clear people from area

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.