Work Method Statements
Concrete Batching Machine Work Method Statement
The Concrete Batching Machine Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure. This SWMS covers the operation of a bin-fed mobile Concrete Batching Machine. This does not include self-loading units, or operation of front end loaders, cranes, forklifts, concrete agitator trucks, accessories such as silos etc, or confined space entry.
The Concrete Batching Machine procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Concrete Batching Machine Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre- operational Inspection
- Transport, Loading & Unloading of unit
- Operation
- Maintenance & Clean up
- Emergency Procedures
- References
Product Details:
- 10 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Planning:
Check for overhead power-lines or other obstructions before raising feed/discharge chutes
Operate unit as per manufacturer’s specifications. Do not leave unit unattended during operation.
Check conveyors/chutes continuously for unusual movement, shaking or pressure release. Discontinue use immediately if detected.
No persons to be working near discharge chute without suitable PPE. Do not touch wet cement without PPE.
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.