Work Method Statements
Concrete Preparation and Laying - Safe Work Procedure or Work Method Statement
The seven page Safe Work Procedure outlines the Safety Steps required to Prepare and Lay Concrete Safely.
Concrete Preparation and Laying needs to be approached with caution and appropiate safety procedures. The Concrete Preparation and Laying procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Risk Assessment
- Personal Safety
- Formwork And Reinforcing
- Concrete Truck Safety
- Finishing Concrete
- Completion
- Emergencies


Concrete Preparation and Laying Safety Notes
When Preparing and Laying Concrete:
- Check the handle and blade of the shovel to ensure it is not broken or skewed.
- Never overload the shovel.
- Ensure safe access and exit on and off the site for the concrete truck.
- When operating concrete, avoid contact with eyes and skin.