Cement Rendering Safe Work Procedure or Work Method Statement

The Seven page Safe Work Procedure outlines the Safety Steps required to Render Cement Safely.

This Procedure or Work Method Statement has been developed for employers to be able to give direct instructions on how to Concrete Render Safely. The document can be used as part of an Induction Process, submitted with a tender or simply implemented into your existing OHS System.

The Procedure includes:

  • Personal Qualifications and Experience
  • Site Awareness
  • Preparation
  • Pre-Start Checks
  • Application
  • On Completion

 

SWMS Sample

The Safety Procedure is in MSWord Format for unlimited printing and use. The Procedure will be emailed directly to you.

Back  Buy Now $79.95 plus GST

 

Additional Safety Information for Cement Rendering

When Cement Rendering:

  • Check that all guard rails, mid rails and toe boards are in place to prevent a person falling.
  • Ensure surfaces have been prepared correctly.
  • Check sand for cleanliness. It should be free from clay, animal faeces or plant matter.
  • Apply render onto the surface by floating with a steel float. The render should be smoothed as work progresses.
  • When finished, the area is to be cleared of any excess material.