Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Concrete Vibrator Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Concrete Vibrator Safe Work Method Statement (SWMS) is a comprehensive 6 page procedure outlining the safety steps for operating a Petrol Driven Concrete Vibrator.

The Concrete Vibrator procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.

It is then ready for printing and to be incorporated as part of your overallOHS System. The Concrete Vibrator procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Operation
  • Refueling
  • Maintenance
  • Emergency Procedures
  • References

Product Details:

  • 6 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Preparation

Inspect equipment. Ensure:

  • Unit is clean, free of oil, grease, concrete
  • Sufficient oil/petrol
  • No leaks
  • Guards in place and undamaged
  • Controls labelled and working
  • No missing screw/bolts
  • No cracked, broken or missing parts
  • No misalignment or binding of moving parts
  • Lock lever in place on cylindrical connector
  • Hoses/couplings/vibrator head secured adequately
  • Hoses undamaged, free of wear/tear
  • Vibrator head/hose assembly suitable for make/model of unit
  • Operator not fatigued or under influence of drugs/alcohol
  • Hair tied back, no loose clothing or jewellery
  • Operator able to handle vibratory force of unit

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.