Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Confined Space Rescue Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Confined Space Rescue Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure.

This SWMS covers general aspects of rescue operations in confined spaces. It does not provide detailed instructions for rescue as these differ in each circumstance. Ensure that a site and task specific SWMS is developed to include emergency procedures applicable to the confined space where work will be conducted

The Confined Space Rescue Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Confined Space Rescue Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Confined Space Rescue includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • References

Product Details:

  • 12 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related Products:

Planning:

Ensure no persons working in Confined Space without Confined Space Entry Permit.

Assess site. Determine:

  • Type of confined space (vessel, pit, tank etc)
  • Geographical location of confined space. (It is vital to know the EXACT address/location of space for emergency response)
  • Type entry/exit points
  • Dimension of space, including entry/exit points
  • Obstacles in and around confined space
  • Type of work being done
  • Number of persons entering confined space
  • Known and potential hazards
  • Lock out /tag out procedures required
  • Communication systems in place
  • Distance to medical treatment facilities
  • Distance of nearest emergency assistance provider
  • Expected response time of closest emergency assistance provider

Determine the type of emergency that could occur based on the type of confined space. Example:

  • Oxygen deficient atmosphere
  • Falls
  • Engulfment
  • Fire/explosion
  • Spills
  • Drowning
  • Hazardous atmosphere
  • Other?

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.