Work Method Statements
Drott (Track Loader) Work Method Statement
The Drott (Track Loader) Safe Work Method Statement (SWMS) is a comprehensive 9 page procedure. This SWMS covers the use of a Drott/Track Loader/4-in-1 bucket loader.
The Drott (Track Loader) procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Drott (Track Loader) Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Pre- start Checks
- Transport
- Operation
- On Completion
- Maintenance
- Emergency Procedures
- References
Product Details:
- 9 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Pre-start Checks
Inspect Drott.
Ensure:
- No fluid leaks
- Hoses/couplings not cracked/split
- Operator controls labelled
- Safety decals in place and legible
- Flashing lights/reversing beepers functioning (if installed)
- Rear-view mirrors are present, functional and adjusted correctly
- Cabin windows are clean and undamaged (if present)
- Work lighting sufficient and functional
- SWL displayed (where required)
- ROPS installed (where required)
- Tracks are undamaged and links are aligned
- Attachments are compatible
- Locking pins/clips for attachments are available and undamaged
- All safety guards are in place and undamaged
- Bucket not cracked. Check teeth for weld cracks of signs or wear/weakness.
- Seatbelt present and in good condition.
- Fire extinguisher present and secured
- No debris, oil or tools present on deck, walkway or steps.
- All stored items in cabin are secured.
Do not use if any fault/damage/missing parts. Report immediately and follow tag-out/lock-out procedures.
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.