Work Method Statements
Fencing Work Method Statement
The Fencing Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure. This SWMS covers general safety aspects associated with building fences.
The Fencing procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Fencing Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
Planning
Inspect intended work area. Check:
- Underground services/utilities Dial before you dig)
- Type of soil (wet, dry, compact etc)
- Rocks, tree roots etc.
- Weather conditions, Lighting
- Cliffs, pits, drop-offs, newly excavated soil, trenches
- Sufficient room so operator will not be knocked or need to over-reach
- Area clear of debris, cut-offs etc
- Work pieces are able to be secured and stable
- Develop site/task specific SWMS
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre Operational Inspection
- Operation
- Maintenance
- Emergency Procedures
- References
Product Details:
- 11 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.