Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Forklift LPG- Safe Work Procedure or Work Method Statement

 

Forklift operation can be performed safely with appropiate training and the Fork Lift Safety Procedure or Work Method Statement forms a vital part of any OHS System or Induction.

The Safe Work Procedure Includes:

  • Personal Protective Equipment (PPE)
  • Pre-Start Checklists
  • Seatbelts
  • General Operatoin
  • Driving On Roads
  • Refuelling and Maintenance
  • 2 Page Complete Procedure
  • MS Word Format
  • Ready to Use
  • Version 4.0

 

SWP_Sample

 

Back       Buy Now $79.95 plus GST

Forklift Safety Notes

Before Commencing Forklift Work:

Day Operations:
Safety footwear, high visibility shirt or vest, sun protection if required (broad brim hat, sun screen, tinted safety glasses).

Night Operations:
Safety footwear, safety vest or shirt suitable for night work (i.e. with reflective strips).

Forklift_Safety

Forklift General Safety

  • Seatbelt to be worn at all times.
  • Operate smoothly.
  • Travel slowly when turning.
  • Don’t turn on inclines.
  • Ensure that there is enough room for the tail to swing around.
  • Travel with load close to the ground.
  • Keep clear of upright mast and carriage lift chains.

If a warning light comes on STOP the forklift truck IMMEDIATELY and seek assistance to rectify.

 

Forklift_Road_Safety

 

Forklift Operators should:

  • Have a current certificate to operate forklift (load shifting equipment).
  • Be trained or under instruction by an authorised person.
  • Be shown the forklft log book.
  • Be familiar with the manufacturer’s operational guide/owners manual.
  • Have an understanding of start up/shut down procedure.

 



 

To Purchase The Complete Safe Work Procedure ForForklift Use Choose The By Now Option Below.

Back       Buy Now $79.95 plus GST