Work Method Statements
Hydraulic Press Work Method Statement or Safe Work Procedure
Hydraulic Press Safe Work Method Statement :
The Hydraulic Press Safe Work Method Statement (SWMS) is a comprehensive 6 page procedure outlining the safety steps for using a Hydraulic Press.
The Hydraulic Press procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.
It is then ready for printing and to be incorporated as part of your overall OHS System. The Hydraulic Press procedure can be used as part of yourOHS inductions, for Tool box talks or tender applications.
Maintenance :
- Maintenance and repair must only be carried out by qualified persons/manufacturer.
- Lubricate all moving parts at regular intervals.
- Always keep the press clean, dry, and protected from harsh conditions.
- Should you need to replace the oil ensure the piston is fully retracted (an excess of oil may render the press inoperative).
Hydraulic Press Notes :
Use only appropriate hydraulic jack oil. DO NOT use brake fluid. Purge the system to remove any air before next use.
Hydraulic Press Safe Work Method Statement includes :
- PPE
- Safety Notes
- Planning
- Preparation
- Operation
- Maintenance
- Emergency Procedures
- References
- 6 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- E - mailed out
