Work Method Statements
Industrial Rope Access Work Method Statement
The Industrial Rope Access Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure. Industrial rope access systems are used for gaining access to, and working at a workface, usually by means of vertically suspended ropes (can be horizontal – such as under bridge work). Other methods of accessing a work face should be considered (for example, EWPs or building maintenance units) before rope access systems, as a high level of skill is essential for their safe use. This SWMS does NOT deal with permanent rope access structures/anchor points that will be left in place, or purpose built suspension rigs.
The Industrial Rope Access procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Industrial Rope Access Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Set up & Operation
- Emergency Rescue
- References
Product Details:
- 10 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Preparation
Ensure suitable rope system is provided:
- full body harness with shoulder straps
- compatible clips, karabiners etc
- suitable WLL
- all components of system meet AS/NZS 4488 and are labeled as such
- manufacturer's instructions are available
Ensure weather conditions have been checked prior to starting.
Note: Conduct regular checks on weather conditions throughout duration of task.
Ensure barricades and warning/caution signs are placed under the work zone to protect the public.
Ensure barricades/warning signs are placed in all anchor point locations to prevent tampering/disturbance.
Ensure adequate supervision for task (eg; Level 2 or 3 certified operators may be required for deviations above the 20 degree rule).
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.