Work Method Statements
Infectious Waste - Handling and Disposal Work Method Statement
This SWMS is for cleaning staff required to clean laboratories where infectious materials are present. The Infectious Waste-handling and disposal procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.
It is then ready for printing and to be incorporated as part of your overall OHS System. The Infectious Waste - Handling and Disposal procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
The document can be used as part of an OHS Induction, submitted with a tender or simply implemented into your existing OHS System.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation and Hazard Communication
- Operation
- Emergency Response
- References
Product Details:
- 6 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
Emergency Response
Develop and implement an emergency response plan for the site. Include:
- Assembly points
- Communication
- Responsible persons
- Emergency contacts (including nearest medical facility)
- First aid equipment
If puncture wound/laceration occurs, report immediately, using agreed forms. Seek medical attention.
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.