Work Method Statements
Jackhammer (Pneumatic) Work Method Statement
Jackhammers need to be used with caution and appropriate safety procedures.
The Jackhammer procedure is not a blank template. Safety procedures can be edited or customised in MS Word if required. This procedure is suitable for pneumatic jackhammers.
Supplied in MS Word for easy printing laminating and can be referred to when necessary.
The Safety Procedure includes:
- PPE
- Planning
- Operators requirements
- Planning
- Pre-operational checks
- Operation
- Risk ratings
- And more...
Product Details:
- 5 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.