Work Method Statements
Kitchen Strip Out and Replacement Work Method Statement
The Kitchen Strip out and replacement Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure outlining the safety steps for strip out of old kitchens and replacement with new kitchen materials (cabinets, bench-tops, painting, flooring).
The Kitchen Strip out and replacement procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.
It is then ready for printing and to be incorporated as part of your overall OHS System.
The Kitchen Strip out and replacement procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Operation
- Emergency Procedures
Product Details:
- 10 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
Preperation - Ensure:
- Power tools are in good condition and power cords are not damaged or have exposed wires
- Electric leads/extension cords are not placed in areas where they could be damaged, run-over or pose a tripping hazard
- RCD/safety switches are provided for electrical equipment.
- Guards in place
- Blades sharp and free of damage
- If applicable, oxy-acetylene cylinders are secured, not leaking, undamaged and in good working order. Flashback arrestors installed. MSDS obtained for gases. Welding mask provided with suitable lens filter.
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.