Work Method Statements
Lawn Mower - Walk Behind Work Method Statement
The Cylinder Lawn Mower (walk behind) Safe Work Method Statement (SWMS) is a comprehensive 7page procedure outlining the safety steps for operation of a walk behind Cylinder Lawn Mower
The Cylinder Lawn Mower (walk behind) procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Cylinder Lawn Mower (walk behind), procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preperation
- Pre operational checks
- Operation
- Refueling
- Maintenance
- Emergency Procedures
Product Details:
- 7 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Conduct visual inspection
Ensure:
- throttle moves freely stays in place as required
- cutting blades secure with no missing/loose nuts, screws
- blades are not cracked, bent, or warped
- muffler shell undamaged
- handle/grips undamaged and free of oil/dirt
- blade guards in place and undamaged
- fasteners in place and secure
- grass catcher or rear flap in place and secured
- unit clean and free of vegetation (no build up of grass around engine and muffler)
- no fuel leaks
- Safety switch present for electric model
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.