Work Method Statements
Paving Work Method Statement
The Paving Safe Work Method Statement (SWMS) is a comprehensive 6 page procedure outlining the safety steps for Laying Pavers.
The Paving procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site-specific details or risks and make it specific to the task at hand.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Operation
- Emergency Procedures
- References
Product Details:
- 6 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
Emergency Procedures
Develop and implement an emergency response plan for the site. Include:
- Assembly points
- Communication
- Responsible persons
- Emergency contacts (including nearest medical facility)
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.