Work Method Statements
Ride On Mower Mid Mounted Cutting Deck - Safe Work Procedure or Work Method Statement
The four page Safe Work Procedure outlines the Safety Steps required to operate a Ride On Mower Safely.
Ride On Mowers need to be used with caution and appropiate safety procedures. The Ride On Mower - Mid Mounted Cutting Desk procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Operation Requirements
- Awarenss
- General Safety
- Refuelling
- Daily Pre-Start Checks
- Comencing
- Operating
- Completion
- Transportation
- Weekly Maintenance


Ride On Mower Safety Notes
When Operating A Ride On Mower with a Mid Mounted Cutting Deck:
- Ensure the mower is on a flat surface and turned off before refuelling.
- Always mow during the day.
- Mow with the engine running at full throtal.
- Never leave the mower while it is turned on.
- Reverse onto trailer, or truck.