Work Method Statements
Ride on Drum Roller Work Method Statement

The Ride on Drum Roller Safe Work Method Statement (SWMS) is a comprehensive 8 page procedure that covers general operation of a Ride on Drum Roller. There are several types of ride on drum rollers and attachments (such as scraper/spray bars, padfoot drums, drag booms, rock crushing, etc).
The Ride on Drum Roller Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Ride on Drum Roller Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Ride on Drum Roller includes:
- PPE
- Safety Notes
- Planning
- Set up & Pre-operational Checks
- Transport to & from Site
- Operation
- On Completion
- Maintenance
- Emergency Procedures
- References
Product Details:
- 8 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Related Products:
Operation:
Follow manufacturer's instructions (including acceptable slope ranges)
Wear seatbelt
Ensure only operator rides on equipment (no passengers)
Follow traffic management plan (including speed limits, traffic flow, traffic controller instructions).
When operated on slopes:
- Never cross a slope, always travel up or down a slope.
- Do not attempt to change gears when travelling on slopes
Attachments:
- Ensure correct for task
- Secure as per manufacturer's instructions
- Test to ensure correct fit/secured
Re-fueling:
- Do not smoke when refueling
- Ensure no ignition sources
Ensure adequate ventilation in refueling area.
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.