Work Method Statements
Rubbish Removal Work Method Statement
The Rubbish Removal Safe Work Method Statement (SWMS) is a comprehensive 4 page procedure outlining the safety steps for the collection and disposal of rubbish. This SWMS does not include bulk collection (such as residential curb-side collection), asbestos waste, dangerous goods/hazardous substance disposal, radioactive, biological, medical or bulk green waste.
The Rubbish Removal procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.
It is then ready for printing and to be incorporated as part of your overall OHS System. The Rubbish Removal procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- Personal Qualifications and Experience
- Site Awareness
- Preparation
- Pre-Start Daily Checks
- Application
- Completion of Work
- Risk Ratings
Product Details:
- 4 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
Rubbish Removal Notes
- Unloading at Landfill
- Follow site instructions
- Be aware of mobile plant in operation
- Wear high visibility clothing (if required), safety boots and safety glasses (especially if windy).
- Park vehicle in safe manner. Check for vehicles before exiting.
- Release ties slowly and remove tarp.
- Do not stand on or enter tray/trailer.
- Use push sticks/tools to remove bags.
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.