Work Method Statements
Scissor Lift Safe Work Procedure or Work Method Statement
The five page Safe Work Method Statement outlines the Safety Steps required to operate a Scissor Lift Safely.
Scissor Lift's need to be used with caution and appropiate safety procedures. The Scissor Lift procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Risk Assessment
- Suppliers Requirements
- Operators Requirements
- Planning
- Site Awareness
- Preparation
- Pre-Start Daily Checks
- Operation
- Travelling
- On Completion
- Close Down
- General Maintenance


Scissor Lift Safety Notes
Before Operating A Scissor Lift:
- The scissor lift must not be steadied by positioning it against another object.
- Signs and/or barricades shall be in place to warn other workers.
- Ensure the work area is clear of workers, equipment, and other obstructions before moving or lowering the platform.
- Secure the scissor lift against unauthorised use.