Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Sheet Metal Roller Work Method Statement or Safe Work Procedure




Sheet Metal Roller Safe Work Method Statement includes:

  • PPE
  • Safety Notes
  • Planning
  • Pre- operational checks
  • Operation
  • Clean up & maintenance
  • Emergency procedure
  • References

  • 5 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific

Clean up & maintenance :

  • Switch off the machine and remove power supply (isolate from power).
  • Clean work area (Use gloves to handle scrap).

Note : Sheet metal edges are sharp.

  • Inspect for damage. If damaged, tag out plant and report immediately.
  • Follow manufacturer’s instructions for regular maintenance and servicing.
  • Ensure any guards removed during maintenance are replaced and secured.

References

OHS Legislation in all States National Standard for Plant [NOHSC:1010(1994)]

Worksafe Victoria - Code of Practice for Plant

DEIR Queensland – Product Manufacturing Industry – Sheet Metal/Plate Rolling Machines, 2003

Worksafe Victoria – A Guide to Safety in the Metal Fabrication Industry 2007.

Australian Standards 4024-1998 Series – Safeguarding of Machinery