Tilt Tray Truck (Loading/Unloading) Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The nine page Safe Work Procedure outlines the Safety Steps required to Load and Unload Machinery onto a Tilt Tray Truck Safely.

This Safety Procedure or Work Method Statement has been developed for employers to be able to give direct instructions on how to Load and Unload onto a Tilt Tray Truck Safely according to the NSW Legislation.

The document can be used as part of an Induction Process, submitted with a tender or simply implemented into your existing OHS System.

The Safety Procedure includes:

  • Personal Qualifications and Experience
  • Site Awareness
  • Pre-Start Daily Checks
  • Preparation - General
  • Shipping Containers
  • Load Binders
  • Loading By Forklift
  • General Maintenance
  • Risk Ratings

Product Details:

  • 9 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • Instant download delivery

Additional Safety Information for Loading and Unloading a Tilt Tray Truck

When Loading/Unloading a Tilt Tray:

  • Check for uneven or sloping ground conditions. - Load can slip while being (un)loaded.
  • Ensure their is adequate lighting and the weather conditions are suitable.
  • Regularly check that the links on the chains have not been stretched, twisted, or are broken/bent.
  • Ensure that all webbing straps are free from cuts, any damage to the seems, and have not been snagged.
  • Ensure that the tilt tray truck is positioned in front of the equipment to be loaded

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.