Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Tractor Slashing - Roadside Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

Tractor Slashing - Roadside

The Tractor Slashing - Roadside Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure outlining the safety steps for operating tractor mounted slashers including horizontal slashers, also known as rotary cutters or brush hogs. The main hazards include crushing from hydraulic failure or tractor roll over; entanglement in unguarded PTO (Power Take-off); being hit by ejected materials; laceration/amputation from unguarded blades; and being hit by moving vehicles/traffic.

The Tractor Slashing - Roadside procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Tractor Slashing - Roadside procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Tractor Slashing - Roadside includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operation Inspection
  • Attaching slasher
  • Travel
  • Operation
  • Completion
  • Emergency Procedures
  • References

Product Details:

  • 12 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related Products:

Attaching Slasher

  • Follow manufacturer's recommendations
  • Clear persons from area
  • Ensure slasher on sturdy base/jockey wheel or hitch frame
  • Reverse tractor into position
  • Turn engine off, and apply handbrake. Do not attempt to attach (or detach) when engine is on
  • Attach to 3-point linkage.
  • Connect driveshaft to PTO and fit PTO cover.
  • Enter tractor and turn engine on. Engage PTO from seat and conduct test run.
  • If attachment is not responding, turn off tractor and apply handbrake before investigating problem.

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.