Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Tree Felling using Dozer Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

Tree Felling using Dozer Safe Work Method Statement

The Tree Felling using Dozer Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure. This SWMS covers hazards associated with the use of Dozers to conduct tree felling/clearing activities.

The Tree Felling using Dozer procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Tree Felling using Dozer Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:

  • 11 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery
Related Products:

Planning

Ensure equipment suitable for task – (know the capabilities and limitations of particular model,

Example: SWL, hp, and gradient of acceptable slopes).

Inspect intended work area. Ensure:

  • Ground surface is suitable
  • No steep slopes, unprotected drop offs, pits or trenches
  • Contact will not be made with underground utilities (dial before you dig)
  • Work is not conducted in close proximity to electrical power lines
  • Sufficient room to operate equipment
  • Remove any debris or equipment (shovels, wheelbarrows etc)

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.