Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Loading & Unloading Trucks - Safe Work Method Statement

SWP_Sample

 

The loading and unloading of trucks has caused thousands of injuries across Australia and New Zealand. Truck Loading and Unloading operation can be performed safely when correct Safe Work Method Statements are used. The Loading & Unloading of Trucks Safe Work Method Statement is a five page Safe Work Method Statement that includes:

  • Driver Safety
  • Risk Assessment
  • Planning
  • Loading (Forklift/WinchGeneral)
  • Removal of Part Load
  • Reversing
  • 5 Page Complete Safe Work Method Statement
  • MS Word Format
  • Ready to Use
  • Version 4.0

 

 

SWP_Sample

Truck Loading/Unloading Safety Information

General Operation

  • The driver must stay out of harms way at all times while loading/unloading is taking place.
  • Traffic movements should be understood and complied with.
  • Suitable access must be provided to tray of trucks. (Steps, grab handles etc.)
  • The tray should be clear of all loose objects.
  • Ensure the forklift driver has a clear view of truck driver at all times.

 

Backhoe_Safety

Buy Now $79.95 plus GST