Work Method Statements
Vehicle Accident Safe Work Procedure
The two page Safe Work Procedure outlines the Safety Steps required when there is a Vehicle Accident.
Vehicle Accidents need to be approached with caution and appropriate safety procedures. The Vehicle Accident procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

The Procedure includes:
- Immediate Response
- Police
- Advise Management
- Insurance
- Signing Documents
- Exchanging Details
- Photograph
- Vehicle Recovery
Vehicle Accident Notes
When in a Vehicle Accident:
- Activate hazard lights (if they're still working).
- Ensure the risk of fire, or any other damages is minimised.
- Notify police if anyone is injured and/or a vehicle has to be towed.
- Ensure the accident scene is safe.
- Exchange details with the individuals involved. (I.E. Full Name, License Details, Rego Details etc.)
