Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Vinyl Tiles - Laying Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Vinyl Tiles - Laying Safe Work Method Statement (SWMS) is a comprehensive 14 page procedure outlining the safety steps for laying vinyl flooring tiles. This SWMS covers installation of vinyl tiles in new premises and addresses the precautions required when using highly flammable and explosive adhesives in the laying of vinyl flooring.

The Vinyl Tiles procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Vinyl Tiles procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Vinyl Tiles - Laying includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Emergency Procedures
  • References

Product Details:

  • 14 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related Products:

Preparation (extract only):

Storing Sealer:

  • Ensure packages are stored within manufacturer's recommendations (example: between 5-35C)
  • Ensure adequate spill containment is provided (eg: Bunded Pallets for packages if required)
  • Out of direct sunlight. Do not allow temperature to exceed 49 degrees
  • Store away from ignition sources
  • Store clear of incompatibles (such as strong acids, oxidizers, aluminium and copper alloys

Note: Ignition sources include pilot lights, stoves, heaters, cigarettes, matches/lighters, grinding, welding, powerpoints, lighting, light switches, radio transmitters, mobile phones, battery powered forklifts etc.

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.