Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Wacker Packer Safe Work Procedure

The three page Safe Work Procedure outlines the Safety Steps required when operating a Wacker Packer.

Wacker Packers need to be used with caution and appropriate safety procedures. The Wacker Packer procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

SWMS Sample

Back  Buy Now $79.95 plus GST

The Procedure includes:

  • Risk Assessment
  • Operators Requirements
  • Planning & Pre-Start Checks
  • Re-Fuelling
  • Starting
  • Operating
  • Completion
  • Transportation
  • Long Term Storage

Wacker Packer Safety Notes

When Operating a Wacker Packer:

  • Never start the machine on a hard surface. Always start it on lose soil or gravel.
  • Ensure the engine is cool prior to re-fuelling.
  • Check that all safety devices and guards are in good working order before operating.
  • Always use the handle to guide the Wacker Packer.
  • Place the throtle in idle on completion.
Back  Buy Now $79.95 plus GST