Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Water Truck Safe Work Method Statement

SWP_Sample

Water Truck injuries can be prevented through correct training and by adopting Safe Handling Procedures.

The nine page Safe Work Method Statement is a vital part of a safe work system.

The Water Truck Safe Work Method Statement is ready to use and are not blank templates. Safety Procedures can be edited or customised in MS Word if required.

The Safe Work Method Statement includes:

  • Personnel - Competent People
  • Risk Assessment
  • Fuelling Truck and Auxilliary Motor
  • Daily Pre-Start Checks - Truck
  • Truck Operation
  • Site Safety - Dust Control Spraying
  • Road Side Safety - Obtaining Water From Hydrant
  • Risk Ratings

 

The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.

Buy Now $79.95 plus GST

Water Truck Additional Safety Information

Before Operating A Water Truck :

  • Ensure all personnel has a suitable truck license before operating vehicle.
  • The controller of the worksite is to perform the risk assessment tests.
  • Ensure that all motors within the area are turned off before re-fuelling.
  • Ensure that there is adequate ventilation and the vehicle is in a spark free environment
  • Before starting the motor, ensure transmission is in neutral and check the throttle for proper operation.
  • Undertake site safety induction with job supervisor.