Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Welding- Spot Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

Welding- Spot Safe Work Method Statement

The Welding- Spot Safe Work Method Statement (SWMS) is a comprehensive 8 page procedure. This SWMS involves the use of a Spot Welding Machine.

The Welding- Spot procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Welding- Spot Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:

  • 8 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery
Related Products:

Planning:

Ensure machine is placed in an area where sparks cannot make contact with flammable materials (at least 10m away from flammables – or as specified by manufacturer).

Check for cracks in walls/floor where sparks may enter.

Ensure:

Safety switch/ RCD is installed and equipment is grounded (to be installed by suitably qualified persons).

  • Safe Operating Procedures are available
  • Manufacturers' instructions/manual available.
  • First Aiders and First Aid Kit provided
  • Fire protection equipment is provided (in test date, accessible to operator)
  • Guards are in place as per manufacturer's instructions.
  • Adequate ventilation is provided as required (mechanical extraction).
  • Sufficient lighting

Suitable welding screens are used as required.

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.