Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Winch Safety Safe Work Procedure

The seven page Safe Work Procedure outlines the Safety Steps required when operating a Winch.

Winches need to be used with caution and appropriate safety procedures. The Wench Safety procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

SWMS Sample

Back  Buy Now $79.95 plus GST

The Procedure includes:

  • Risk Assessment
  • Preparation
  • Pre-Start Checks
  • Towing & Poles
  • Operating
  • Completion
  • Emergencies

Winch Safety Notes

When Operating a Winch:

  • Do not exceed the maximum weight specified for the winch.
  • Use leather gloves.
  • Keep all body parts and clothing clear of winching cable
  • Never allow anyone to stand under a raised load.
  • Avoid sudden shock or jerking on the load.


Back  Buy Now $79.95 plus GST