Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Auger Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Auger Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure outlining the safety steps for the use of a hand held Auger. The Auger Work Method statement main hazards are entanglement, noise, manual handling and mobile plant.

The Auger procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Auger procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • Preparation
  • Pre-start Checks
  • Commence Operating Motorised Auger
  • Commence Operating Hand-Held Auger
  • Emergency Procedures
  • Risk Ratings

Product Details:

  • 10 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Before Operating An Auger:

  • Always use adequate eye and hearing protection.
  • Confirm there are no open flames around the Auger.
  • Make sure the area is clear.
  • Keep the Auger head sharp and clean.
  • Tie back long hair.

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.