Work Method Statements
Bench Grinder Work Method Statement
The Bench Grinder Safe Work Method Statement (SWMS) is a comprehensive 7 page procedure outlining the safety steps for use of a Bench Grinder.
The Bench Grinder procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Bench Grinder procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Pre-operational Inspection
- Operation
- Completion
- Maintenance
- Emergency Procedures & First Aid
Product Details:
- 7 page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Planning to use a Bench Grinder
Ensure:
- Emergency stop/s fitted
- Sufficient room to complete tasks (establish exclusion zone around operator)
- Sufficient lighting
- Safety switch/ RCD is provided
- Safe operating Procedures are available
- Manufacturers' instructions/manual available.
- First Aiders and First Aid Kit provided
- No flammable materials stored with 6m.
- Rings, bracelets, watches etc are removed.
- Long hair is tied back
- No loose clothing or gloves are worn
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.