Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Working Outdoors  - Prevention and Treatment of Bites/Stings Safe Work Method Statement

Trailer Mounted Air Compressor
SWP_Sample
Buy Now

 

The SafetyProcedure includes:

  • Operators Requirements
  • Planning
  • Snake Bite Prevention
  • Snake Bite Treatment
  • Wasp/Bee Stings Prevention
  • Wasp/Bee Stings Treatment
  • Mosquito/Tick Bites Prevention
  • Mosquito/Tick Bites Treatment
  • General Outdoor Hazards

 

General Bite And Sting Safety Information:

Bites and Stings need to be handled with caution and appropriate safety procedures.

The Prevention and Treatment of Bites/Stings procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.