Boom Lift Safe Work Procedure or Work Method Statement

The seven page Safe Work Method Statement outlines the Safety Steps required to operate a Boom Lift Safely.

Boom Lift's need to be used with caution and appropiate safety procedures. The Boom Lift procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • Travelling To Job Site
  • Pre-start Checks
  • Elevating Boom Lift
  • Working From Boom Lift
  • Securing Boom Lift
  • Emergency Procedures

 

Weed_Spray

Back  Buy Now $79.95 plus GST

Boom Lift Safety Notes

When Operating A Boom Lift:

  • Never use malfunctioning or damaged equipment.
  • Ensure to look all directions when elevating boom lift.
  • Do not use boom lift as a crane or lifting device, do no overload the platform.
  • Never use ladders, scaffolding, or other objects to gain extra height on the platform.
  • Keep the equipment secured to prevent unauthorized use.