Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Brake Press Safe Work Procedure or Work Method Statement

The seven page Safe Work Method Statement outlines the Safety Steps required to operate a Brake Press Safely.

Brake Presses need to be used with caution and appropiate safety procedures. The Brake Press procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • Operators Requirements
  • New Operator Induction
  • Site Awareness
  • Pre-Start Checks
  • Preparation
  • Operation
  • On Completion
  • General Maintenance

 

Weed_Spray

Back  Buy Now $79.95 plus GST

Brake Press Safety Notes

Before Operating A Brake Press:

  • Check all guards to insure they are operating and in place.
  • Check emergency stop switches are working.
  • Ensure heavy items are supported.
  • Ensure foot pedal is placed out of the way of material to be bent.
  • Keep hands well clear of blade area.
Back  Buy Now $79.95 plus GST