Work Method Statements
Brick Laying Safe Work Method Statement

This 7 page Safe Work Method Statement outlines the Safety Steps required to Safely Lay Bricks.
The Brick Laying procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Safe Work Method Statement includes:
- Operators Requirements
- Transporting
- Planning
- Site Awareness
- Site Set-Up
- Set Up For Heights
- Daily Checks
- Operation
- Risk Ratings
The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.
Brick Laying Additional Safety Information
When Brick Laying:
- All employees involved within Bricklaying should be qualified / trained laborers.
- Ensure the Mixer is positioned in the vehicle to avoid damage.
- Ensure that all tools are adequately restrained.
- Ensure that a trained first aid officer is always within the team involved in bricklaying activities.