Work Method Statements
Cleaning Without Adequate Ventilation Work Method Statement
First Aid/Emergency Response
Chemicals
Inhalation:
- Remove person into a well ventilated area
- Remove any contaminated clothing
Skin contact:
- Wash with large volume of water
- If blistering, redness or irritation occurs – seek medical attention
Eye Contact:
- Flush eye with water for at least 15 minutes
Ingestion:
- Do not induce vomiting
- Provide water and seek medical attention
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Operation
- First Aid/Emergency Procedures
- References
- 8 page procedure
- Microsoft Word Format
- Make it task specific
- E-mailed out
Cleaning Without Adequate Ventilation Information:
The Cleaning in cramped areas without adequate ventilation Safe Work Method Statement (SWMS) is a comprehensive 8 page procedure.
This SWMS is intended for cleaners working in cramped work areas where ventilation is limited. This does NOT include cleaning in “Confined Spaces” as defined in relevant OHS legislation. For cleaning in Confined Spaces, a Confined Space SWMS must be used in conjunction with a Confined
Space Entry Permit system.
The Cleaning without adequate ventilation
procedure is ready to use
and is not a blank template.
Simply add your company
details, ABN, and include
any site specific details or
risks and make it specific to
the task at hand. It is then
ready for printing and to be
incorporated as part of your
overall OHS System.
The Cleaning without adequate
ventilation procedure can be used
as part of your OHS inductions, for
Tool box talks or tender applications.
