Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Concrete Pumping With Truck Mounted Placing Boom Safe Work Procedure or Work Method Statement

The eight page Safe Work Method Statement outlines the Safety Steps required to operate a Concrete Pump with Truck Mounted Placing Boom Safely.

Concrete Pumping needs to be used with caution and appropiate safety procedures. The Concrete Pumping procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • Site Awareness
  • Suitable Location
  • Boom Set-Up
  • Delivery Pipeline Set-Up
  • Pre-Start Daily Checks
  • Concrete Delivery
  • Pumping
  • On Completion

 

SWMS Sample

Back  Buy Now $79.95 plus GST

Concrete Pumping Safety Notes

When Concrete Pumping:

  • Isolate the concrete truck and pump zone with fencing or other barriers.
  • If working in the street, comply with local by-laws.
  • Check all individual components for wear and possible damage.
  • Check each vertical bend is fixed to stop movement of the bend.
  • Pumping equipment must be in a mechanically sound condition
Back  Buy Now $79.95 plus GST