Work Method Statements
Cut-Off Metal Saw Safe Work Procedure or Work Method Statement
The five page Safe Work Method Statement outlines the Safety Steps required to operate a Cut-Off Metal Saw Safely.
Cut-Off Metal Saws need to be used with caution and appropiate safety procedures. The Cut-Off Metal Saw procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Risk Assessment
- Clear Work Area
- Clamp And Support Material
- Protective Equipment
- Switch On
- Begin Cutting
- Turning Off
- Repairs


Cut-Off Metal Saw Safety Notes
Before Operating A Cut-Off Metal Saw:
- Clear area of any flammable liquids and materials.
- Ensure there is sufficient lighting.
- Put on full face head and hearing equipment.
- Switch on machine and lower cutting wheel to commence cutting.
- Watch for sparks and movement of other people in the area.