Epoxy Grout Application Work Method Statement
The Application of 3 Part Epoxy Grout Safe Work Method Statement (SWMS) is a comprehensive 7 page procedure outlining the safety steps for Application of 3 Part Epoxy Grout.
This SWMS is intended for using 3 Part Epoxy Grout in areas where ventilation is limited. This does NOT include 'Confined Spaces' as defined in relevant OHS legislation. For working in Confined Spaces, a Confined Space SWMS must be used in conjunction with a Confined Space Entry Permit system.
The Application of 3 Part Epoxy Grout procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Application of 3 Part Epoxy Grout procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Mixing
- Operation
- First Aid/Emergency Response
- References
Product Details:
- 7 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
Preparation
Ensure MSDS is available at work site and all employees/ persons read, understand and know where to find them.
Provide adequate lighting if required. Provide as much ventilation as possible. Open windows / doors. Use mechanical ventilation or correctly positioned portable fans.
Ensure PPE is supplied as prescribed in MSDS (example, PVC gloves, half or full face respirators with appropriate cartridge or supplied air, chemical goggles, aprons, gauntlet gloves, rubber boots (ensure pants are not tucked into boots in case of spill) etc).
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.