Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Excavator - Auger Attachment Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Excavator - Auger Attachment Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure outlining the safety steps for using an auger attachment on an excavator.

This SWMS covers the use of an Auger when attached to an excavator. This SWMS must be used in conjunction with Safety Culture’s Excavator SWMS.

The Excavator - Auger Attachment procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Excavator-auger attachment work method statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Pre operational inspection
  • Connecting attachment
  • Operation
  • On completion
  • Maintenance
  • Emergency Procedures

Product Details:

  • 10 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • Instant download delivery

On Completion

Lower boom down so that auger is laying flat on ground.

Follow manufacturer’s instructions for detaching. Check whether hose pressure needs to be relived before detaching. Use caution, fluid is under pressure and hot.

Clean unit and inspect for any damage, leaks or faults. Report as required.

Use lifting equipment to transport unit for storage.

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.