Work Method Statements
Forklift Maintenance Work Method Statement
The Forklift Maintenance Safe Work Method Statement (SWMS) is a comprehensive 8 page procedure outlining the safety steps for undertaking forklift maintenance at other sites.
The Forklift Maintenance Work Method Statement is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Forklift Maintenance procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Set Up
- Operation
- Emergency Procedures
- References
Product Details:
- 8 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
Emergency Procedures
Develop and implement an emergency response plan for the site. Include:
- Assembly points
- Communication
- Responsible persons
- Emergency contacts (including nearest medical facility)
- First aid training and equipment
- Fire extinguishers (use and availability/location)
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.