Work Method Statements
Front End Loader Work Method Statement
The Front End Loader Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure outlining the safety steps for using a front end loader.
The Front End Loader procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Front End Loader Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Pre-start checks
- Transport
- Operation
- On Completion
- Maintenance
- Emergency Procedures
- References
Product Details:
- 11 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
Pre Start Checks for Using a Front End Loader
Inspect Loader. Ensure:
- No fluid leaks
- Hoses/couplings not cracked/split
- Operator controls labelled
- Safety decals in place and legible
- Flashing lights/reversing beepers functioning (if installed)
- Rear-view mirrors are present, functional and adjusted correctly
- Cabin windows are clean and undamaged (if present)
- Work lighting sufficient and functional
- SWL displayed (where required)
- ROPS installed (where required)
- Tyres are undamaged, even pressure.
- Bucket attachment compatible
- Locking pins/clips for attachments are available and undamaged
- All safety guards are in place and undamaged
- Bucket not cracked. Check teeth for weld cracks or signs or wear/weakness.
- Seatbelt present and in good condition.
- Fire extinguisher present and secured
- No debris, oil or tools present on deck, walkway or steps.
- All stored items in cabin are secured.
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.