Work Method Statements
Guillotine Use Safe Work Procedure or Work Method Statement
The four page Safe Work Method Statement outlines the Safety Steps required to operate a Guillotine Bike Safely.
Guillotine's need to be used with caution and appropiate safety procedures. The Guillotine Use procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Risk Assessment
- Clear Machine and Work Surfaces
- Start Motor
- Position Work To Be Cut
- Activate Guillotine
- Switch Off Motor
- Remove Cut Material


Guillotine Use Safety Notes
When Operating A Guillotine:
- Clean off any scrap material from previous job.
- Ensure cutting blade is clear.
- Use a movable bench for large sheets of material.
- Ensure nobody is near movable clamping guard.
- Wait until cut is complete and lift foot or press up button .