Work Method Statements
Working Safe At Heights Safe Work Procedure or Work Method Statement
The seven page Safe Work Method Statement outlines the Safety Steps required to Work At Heights Safely.
Working At Heights needs to be approached with caution and appropiate safety procedures. The Working Safe At Heights procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Risk Assessment
- Risk Control Order
- Planning
- Site Awareness
- Preparations
- Daily Checks
- Site Safety


Working At Heights Safety Notes
Before Working At Heights:
- The equipment being used should be checked for any damage and replaced if so.
- When required fall arrest scaffolding should be installed around the perimeter of the building.
- Ladders must be identifiable of commercial quality, and inspected before and after use.
- Working surfaces must be checked to ensure that they have the strength and structural integrity to safely support workers.